Kibworth Rail Bridge Demolished As New Structure Takes Shape
Written by HFM News on 23rd October 2023
A new bridge over the railway in Kibworth is starting to take shape after the old structure was demolished at the weekend.

The old bridge was demolished Pic: Network Rail
The historic pedestrian bridge off School Road was flattened and the new bridge structure craned into place while the line was closed to trains.
Network Rail engineers worked round-the-clock to complete the first part of the bridge renewal work.
The rest of the work is set to take around six months and while the bridge is shut to pedestrians a temporary footbridge has been put in place for villagers to use.

Pic: Network Rail

The new bridge structure was lowed into place Pic: Network Rail

The new bridge structure was lowed into place Pic: Network Rail

The new bridge structure was lowed into place Pic: Network Rail